The Buffalo Creek Trail volunteer team has been working on several different projects during the past month.  First, the Pollinator Garden has been receiving special attention. Volunteers have put down a layer of cardboard between the plantings to smother weeds, then covered the cardboard with a layer of wood chips.

One loop of the walking trail was re-routed to avoid a bridge that has deteriorated and is no longer safe. This section of the trail is beyond the meadow where the fire pits are located. The bridge will be removed when time permits; till then, the bridge has been taped off and a new trail route has been cleared and marked with flagging tape.

The chapter purchased a load of crushed rock, which county personnel spread for us over a section of road that was difficult to navigate due to soft dirt.  This area, where the road to the Agricultural Center splits from the road to the meadow, is now in much better shape.

Volunteers spent several workdays treating invasive stilt grass along the Wedding Ring Loop.  Now that the stilt grass is dying, native plants like false nettle (Boehmeria cylindrica) and trumpet creeper (Campsis radicans) are filling in, and the azaleas that were planted in this area several years ago are more visible.

Buffalo Creek Trail work sessions are every Tuesday morning, subject to change based on weather, road conditions, and other factors. For the most up-to-date information on the workday schedule, please check the chapter’s Facebook page.  Volunteers should park at the Greenbelt lot on Old Newnan Rd. across from the driver’s license office and walk down the hill. The entrance to the Buffalo Creek Trail will be on your left once you pass the metal buffalo statue. Bring work gloves and water to drink, and bug spray is recommended.

Pin It on Pinterest

Share This
GNPS Menu